National Highways Sector Scheme (NHSS) 12D M5 is for all Registered Traffic Management Operatives (RTMO) as described in Sector Scheme Document 12D who wish to add this category to their 12D card.
What Will Be Covered?
• Reference Documentation • Health & Safety Requirements • Trailer Towing/License Requirements • Multi-Phase Traffic Signal Installations • Multi-Phase Traffic Signal Operation • Multi-Phase Traffic Signal Controllers • Datum Point Systems • Longest Journey Systems • Multi-Phase Traffic Signal Configurations • Multi-Phase Traffic Signal Other Functions • Preparation • Installation, Maintenance & Removal • Equipment & Road Types • Pedestrian Phases • M5 End of Course Test
On completion of this course you will:
• Be aware of National Highway Sector Schemes • Be aware of Health and Safety requirements • Be aware of Risk Assessments and Method Statements • Be aware of the relevant Codes of Practice and other associated documentation when involved in Traffic Management • Identify the equipment required in Temporary Traffic Management • Understand the requirements for multi-phase traffic signals • Understand how to operate multi-phase traffic signals. • Be aware of the requirements of non-motorised road users • Be prepared to undertake assessments to demonstrate an ability to implement, maintain and remove safely traffic control systems.
Pre-requisites:
Complete a NHSS12D T1/T2 training course.
To become a registered NHSS12D M5 Operative, the learner must either be in the process of being registered as a 12D M2 Operative or already be a registered 12D M2 Operative prior to applying for registration.
Recognised by:
National Highways, Transport Scotland, Welsh Assembly and Transport NI on their rural and urban road networks
Duration:
Half Day
The course either has new dates in data loading, or is only run as a dedicated or In Company course.